No | Plan | Status | Remark | ||
---|---|---|---|---|---|
1 | Comprehensive Development Plan(CDP) | Approved | The Makati CDP was adopted through a City Resolution No. 2018-042 | Document | |
2 | Comprehensive Land Use Plan (CLUP) | Approved | The Makati CLUP (2013-2023) with its corresponding Zoning Ordinance (ZO) was adopted through City Ordinance No. 2012-101 and City Ordinance No. 2012-102, respectively | Document | |
3 | Contingency Plan for Earthquakes | Approved | The enhanced Makati Earthquake Contingency Plan was adopted by the City through the City Ordinance No. 2018-052 | Document | |
4 | Contingency Plan for Hydrometeorogical Hazards | Approved | The Contingency Plan for Hydrometeorological Hazard was adopted by the City through the City Ordinance No. 2018-056 | Document | |
5 | Evacuation Plan in case of earthquake | Draft | Ongoing formulation of Evacuation Plan for Earthquake; conducted evaluation and assessment of Safe Open Spaces | Document | |
6 | Evacuation Plan in case of typhoon or weather disturbance | Draft | Ongoing formulation of Evacuation Plan in case of flood and weather disturbances; conducted evaluation and assessment of Safe Spaces (i.e. covered court, gymnasium, etc.) | Document | |
7 | LDRRM Plan | Approved | The Makati DRRM Plan (2019-2030) was adopted by the City through the City Ordinance No. 2019-A-015 | Document | |
8 | Local Climate Change Action Plan (LCCAP) | Approved | The LCCAP was adopted through City Ordinance No. 2012-101 and City Ordinance No. 2017-076 | Document | |
Showing 1 to 8 of 8 entries
|